SLU Grand Hall DormA Jarrell Case Study
Project Overview
Grand Hall will house 528 first- and second-year students on six residential floors in single and double suite-style rooms. The hall features classrooms, a conference room, meeting rooms, study rooms, floor lounges, kitchens and laundry areas on alternating floors among other amenities.
Jarrell was the HVAC design-build contractor for this project and installed a Variable refrigerant flow (VRF) system. The General Contractor was Alberici Constructors which Jarrell worked closely with to coordinate and meet the construction schedule which included a target opening date of fall 2017.