Parkway TowersA Jarrell Case Study
Project Overview
Jarrell removed two-125 ton water cooled chillers, nine boilers, six pumps and old outdated control system and replaced them with one- 270 ton air-cooled chiller, two 99% boilers, three pumps and a new Distech control system to control new chiller/boiler plant and all doors in the building.
Jarrell was the design and build contractor for the project, partnering with property management company Intelica.