James J Eagan CenterA Jarrell Case Study

Project Overview

Jarrell assisted with a variety of elements on this project for James E. Eagan center. This included:

  • Replacing 9-two pipe air handlers with water source heat pumps.
  • Installing a new heat pump loop including new pumps as well as a plate and frame heat exchanger.
  • Piping into the existing cooling tower piping & replacing existing two pipe air handlers with four pipe air handers.
  • Installing a new hot water heating piping loop & air handling equipment.
  • Adding a new water cooled chiller & boiler.
  • Installing new stainless steel flue pipe from the lower level mechanical room out through the roof to a new natatorium roof mounted unit.
  • Installing new duct-sox in the pool.
  • Separating the ice rink chiller plant from the central plant.
  • Installing a new DDC control system.

All of this work was performed while the building remained in operation.