Covenant Place
Project Overview
The complete renovation of this senior living facility was established in two phases, allowing tenants to remain in half of the building while the remodeling took place. Jarrell was tasked with the removal and replacement of the following equipment:
- 152 PTACS were removed and replaced with 157 VTACs
- 16 VRF units were added
- 2 AHU splits and 1 mini-split was added
- Water piping above the 1st floor as well as all drains, waste, vent piping were upgraded.
- 163 bathroom plumbing fixtures were replaced
- Domestic water heating equipment was replaced
- Water softener system was added