CityPlace One
Project Overview
This project included the installation of a modern digital building automation system (BAS) in order to efficiently control the building's HVAC systems. This project included a chiller plant, boiler plant, 2 rooftop units, 240 Variable Air Volume (VAV) controllers, 12 Fan Terminal Units (FTUs) as well as 4 Fan Coil Units (FCUs).
$156,123Total Energy
Savings
$260,776Incentives
Achievement
3.70 YearsPayback Without
Incentives
2.03 YearsPayback With
Incentives