We removed two 125 ton water cooled chillers, nine boilers, six pumps and old outdated control system. We went back in with one 270 ton air-cooled chiller, two 99% boilers, three pumps and a new Distech control system to control new chiller/boiler plant and all doors in the building. Jarrell was the design and build contractor for the project,partnering with property management company Intelica.