Back in June of 2017 the Clarkson Executive Building lost a 170 ton water cooled DX unit. Our team sprang into action setting up a temporary system and having the building cooling within 24 hours. We are now replacing the DX unit and coils with a new 200 Ton Trane Chiller, new water coils and new 400 ton cooling tower. The new system will be controlled by a new Distech Control System also operating the drives and fresh air louvers. The four blower assemblies will be upgraded from pneumatic controls and inlet guide wanes to new ABB drives. This project was commission by the property manager, Intelica.