Army Reserve Center – Joint Base Lewis-McCord, WAA Jarrell Case Study
Project Overview
Jarrell is excited to announce that we have been awarded a contract to design, build, and install plumbing and HVAC systems for a new 55,000 square-feet training center. The training center is comprised of a two-story conventional building including open and private offices, storage, classrooms, assembly area, locker rooms and many more areas. HVAC will be provided by one central variable air volume air-handling unit, variable air volume terminal units, a heating hot water system, and a chilled water cooling system. We are honored to be a part of this project and to have another successful project with the Korte Team at Joint Base Lewis-McCord.