Case Study

/Case Study

The Everly in the Loop

August 30th, 2017|Case Study|

Jarrell recently completed an iconic residential space in the heart of U City. The building is located right on Delmar with the new Trolley running right in front of it. Jarrell employed dozens of Union Craftsmen and delivered over 40% minority participation in completing this signature project Description: 14-story, 209-unit residential complex with 428 bedrooms [...]

SLU Grand Hall Dorm

August 11th, 2017|Case Study|

Jarrell Mechanical completes HVAC work on the new $71 million SLU Grand Hall dorm. Grand Hall will house 528 first- and second-year students on six residential floors in single and double suite-style rooms. The hall features classrooms, a conference room, meeting rooms, study rooms, floor lounges, kitchens and laundry areas on alternating floors among other [...]

Lindenwood Library

August 2nd, 2017|Case Study|

Lindenwood Margaret Leggat Butler Library This was a large VRF job consisting of (7) 36 ton Trane heat recovery systems, 4 Horizon OAU's with heat wheels and digital scroll compressors, and Trane Controls. Jarrell Mechanical Contractors offered up a VE option using Trane as a more than viable solution to the construction manager on bid [...]

Historic Union Station Midway

July 21st, 2017|Case Study|

The quality Tradesmen at Jarrell Mechanical Contracting recently removed and replaced roof tops units on the Historic Union Station Midway. Project completed same day! Another fast track, critical project completed safely and quickly.

Mitek

June 30th, 2017|Case Study|

When MiTek needed a state of the art cooling system for their server room, our team was ready for the job! Team Jarrell completed the install along with Rooftop units with a VAV System and Diestech controls.

Perry County Courthouse

June 29th, 2017|Case Study|

We recently completed a HVAC project at the Perry County Courthouse which was build in 1905. Our team installed a LG Variable Refrigerant System in this historic building while it remained occupied.

Fox Theatre, St. Louis, MO

September 20th, 2016|Case Study|

Project Overview:  "The Fabulous Fox" has been a landmark in St. Louis since 1929. Jarrell Contracting was hired to increase the cooling capacity while saving energy, and that's what we did.  After completing an energy audit, it was determined that the HVAC system could be substantially improved by replacing the three main air handling systems and [...]

James J Eagan Center

September 10th, 2016|Case Study|

The project consisted of replacing nine two pipe air handlers with water source heat pumps, installing a new heat pump loop including new pumps, a plate and frame heat exchanger, piping into the existing cooling tower piping, replacing two existing two pipe air handlers with four pipe air handers, installing a new hot water heating [...]

Faurecia Columbus, IN

September 7th, 2016|Case Study|

The Faurecia South plant in Columbus, IN is a state-of-the-art manufacturing facility with over 400,000 square feet. Our design and installation included large rooftop units with VAV, high volume exhaust systems, full plumbing and storm water systems, and process gases.

Centene Service Center Ferguson

September 7th, 2016|Case Study|

Centene was a design-build project and a joint venture with Clayco Corporation. The project consisted of three buildings: a Service Call Center, Training Facility and a Daycare Center. All three buildings are served by VRV systems and 100% outside air units with heat recovery wheels for the exhaust for maximum energy efficiency of the building [...]