Case Study

/Case Study

Mason Pointe

February 13th, 2019|Case Study|

The Jarrell Team is excited to announce a new project for 2019! We are the HVAC Design/Build Contractor for a 156 Unit independent living apartment addition to the existing Mason Pointe facility. We are teaming up on this 390,000 sq.ft. addition with BSI Constructors as General Contractor, Grubbs & Associates as Architect, and Luthern Senior Services as the [...]

15933 Clayton Rd

January 27th, 2019|Case Study|

We removed one 168 ton Dx chiller and one 350 ton tower and an outdated control system. We went back in with one new 200-ton water cooled chiller and one new 400-ton tower and upgraded the DDC control system with a new Distech control system for the entire building. We also upgraded the two air [...]

Parkway Towers – 225 S. Meramec

January 27th, 2019|Case Study|

We removed two 125 ton water cooled chillers, nine boilers, six pumps and old outdated control system. We went back in with one 270 ton air-cooled chiller, two 99% boilers, three pumps and a new Distech control system to control new chiller/boiler plant and all doors in the building. Jarrell was the design and build [...]

New Project! Ranken Rendering

October 9th, 2018|Case Study|

Jarrell is proud to announce a new project consisting of a  40-ton Trane Voyager VAV and a 50-ton Trane Voyager VAV rooftop units. These units will serve a 22,926 sqft single story facility. The Jarrell Team will be partnering with Contractor, L.Keely Construction and Architect, JEMA.  

BJC Alton Memorial Addition

August 27th, 2018|Case Study|

The Jarrell team is excited to partner with The Korte Company on this 2-story, 42,166sq.ft. addition to the existing Medical Office Building "B", located on the Alton Memorial Hospital campus in Alton, Illinois. The new facility complements and maintains the existing design vocabulary of the existing buildings on the Alton campus. Building materials included tilt-up [...]

Friendship Village Sunset Hills

August 27th, 2018|Case Study|

We are excited to partner with Paric on this new expansion of Friendship Village's 52-acre campus. This project will include 15 memory care units, a new chapel, and two courtyards that will be added to the Fountainview Assisted Living facility, complete with a kitchen expansion. A new five-story, 128,000 sq. ft. independent living building with [...]

Clarkson Executive Building

August 27th, 2018|Case Study|

Back in June of 2017 the Clarkson Executive Building lost a 170 ton water cooled DX unit. Our team sprang into action setting up a temporary system and having the building cooling within 24 hours. We are now replacing the DX unit and coils with a new 200 Ton Trane Chiller, new water coils and [...]

Union Trust 705 Olive St.

June 28th, 2018|Case Study|

Jarrell Mechanical Contractors has teamed with BSI Constructors contracted by Restoration St. Louis to restore the historic Adler & Sullivan building located at 705 Olive in downtown St. Louis which was originally built in 1893. Jarrell Mechanical Contractors is performing the mechanical and plumbing services in this restoration project which consist of 130 room hotel [...]

ADB

June 28th, 2018|Case Study|

Jarrell Mechanical Contractors is excited to be partnering with L. Keely on the ADB project in Pacific, MO.  This 42,000 square foot office building will include 21,000 square foot shop.  The Jarrell Team will be installing Distech Controls with a Dakin rooftop units serving the office space.

Chouteau Grove – Update

May 30th, 2018|Case Study, Uncategorized|

The Jarrell Team is wrapping up the project, Chouteau Grove. This mixed-use project had many obstacles with different types of systems to be installed but we are excited to have had the opportunity to show what our team is made of. Project Announcement We are excited to announce a new Multi-Family Project. We will be installing [...]