Case Study

/Case Study

Army Reserve Center – Joint Base Lewis-McCord, WA

March 19th, 2020|Case Study|

Jarrell is excited to announce that we have been awarded a contract to design, build, and install plumbing and HVAC systems for a new 55,000 square-feet training center. The training center is comprised of a two-story conventional building including open and private offices, storage, classrooms, assembly area, locker rooms and many more areas. HVAC will [...]

F-35 Integrated Training Center – Eglin AFB, FL

March 19th, 2020|Case Study|

Jarrell will be joining The Korte Company in the building of a new maintenance training facility at Eglin Air Force Base in Florida.  The new 85,510 square-foot facility will house academic classrooms, virtual trainers, various aircraft mockups, administrative, and operations areas.  We’re proud to be a part of this project that will provide training for [...]

P403 Reconditioning Center Barracks Renovation – Parris Island, SC

March 19th, 2020|Case Study|

Jarrell is excited to announce that we have been awarded a contract to design, build, and install plumbing and HVAC systems for the reconstruction of Center Barracks at Parris Island, SC.  We are partnering with The Korte Company for the reconstruction which includes new construction as well as a renovation of the old barracks. The [...]

NSST Hanger Renovation – Naval Station Mayport, FL

March 19th, 2020|Case Study|

Jarrell Mechanical Contractors is proud to announce that we are partnering with The Korte Company to transform the NSST Hangar 1338 at Eglin Air Force Base into a state-of-the-art training facility designed to train Navy bridge teams using simulators.  The renovation and build-out will include the design and replacement of existing HVAC systems in the current [...]

4161 Highway K

March 2nd, 2020|Case Study|

The Jarrell Team is excited to announce a new project for West Community Credit Union located at 4161 Highway K in O’Fallon, Missouri. We are partnering with contractor L. Keeley to install a Trane-Mitsubishi VRF system.

Union Station – Phase 2

February 10th, 2020|Case Study|

With Jarrell Mechanical’s involvement in the installation of a Distech Building Automation Energy Management System for the Union Station Hotel (in 2018), it was an ideal fit to task Jarrell Mechanical with the extension of the hotel’s BAS to the new HVAC systems in the renovation of the mall area and the addition of the [...]

100 Above the Park

January 9th, 2020|Case Study|

Jarrell Mechanical Contractors is excited to be working with Clayco Corporation on the 100 Above the Park project. This project is a design-build HVAC and DDC Control project. This is a 36 story Luxury Apartment complex that was recently topped out allowing Jarrell Mechanical Contractors to install their inhouse prefabricated mechanical skid consisting of Boilers, [...]

680 Craig Rd

January 9th, 2020|Case Study|

Jarrell is excited to complete this control upgrade project at 680 Craig Road for Larson Capital Group. This building had existing pneumatic HVAC controls that we upgraded to Trane DDC. We implemented occupied/unoccupied space temperature setback along with CO2 based demand-controlled ventilation, optimum start and supply air reset. The estimated savings for this project is [...]

Lincoln County Justice Center

November 20th, 2019|Case Study|

Jarrell Mechanical’s GEMS team is excited to announce the completion of recent HVAC renovations to the Lincoln County Justice Center, a 2 story, 25,732 sf facility with three courtrooms, various administrative offices, and miscellaneous spaces.  The renovations are estimated to reduce electric usage by 82.5% annually and save 76% on the annual bill, an estimated [...]

Concordia Lutheran Church

September 3rd, 2019|Case Study|

The Jarrell Team is excited to announce the newly completed project for the Concordia Lutheran Church.  We worked with The Korte Company on this 35,762 square foot design-build addition, installing HVAC and Plumbing which included new classrooms, kitchen, science/laboratory spaces, cafeteria, art workshop, and kiln room.  The school and the church remained occupied and fully [...]