Jarrell Mechanical Contractors is excited to be working with Clayco Corporation on the 100 Above the Park project. This project is a design-build HVAC and DDC Control project.

This is a 36 story Luxury Apartment complex that was recently topped out allowing Jarrell Mechanical Contractors to install their inhouse prefabricated mechanical skid consisting of Boilers, Pumps, and piping prior to the mechanical room being completely assembled which allowed them to utilize the tower crane for installation of the system.

Jarrell also utilized the Tower crane to install the inhouse prefabricated steel for the cooling towers and cooling tower installation along with the Multi-Section Dedicated Outside Air Unit that had to be assembled together with the assistance of the tower crane.